top of page

Embree Pumphouse Retrofit

Rodco Mechanical (2014) Ltd. was awarded the contract to upgrade the main booster station in the Town of Embree in 2024.

The existing system was no longer reliable and required a full upgrade of piping, valves, pumps, controls and a sediment filtration system.

The new equipment layout also allowed for easier maintenance and the addition of a new large booster pump provided a more reliable system for fire flow.

© 2022 by Rodco Mechanical (2014) Ltd.

  • Facebook
  • Linkedin
bottom of page